2 men and 7 boys can do a piece of work in 4 days. The same work is done in 3 days by 4 men and 4 boys. How long would it take one man and one boy to do it?

Let the number of days in which 1 man and 1 boy can do the work be ‘a’ and ‘b’ respectively.


In 1 day, 1 man does 1/a part and 1 boy does 1/b part.


Given, 2 men and 7 boys can do a piece of work in 4 days. The same work is done in 3 days by 4 men and 4 boys.


-------- (1)


-------- (2)


Multiplying eq1 by 2 and subtracting eq2 from eq1



10/b = 1/6


b = 60 days


Thus, 4/a + 1/15 = 1/3


4/a = 4/15


a = 15 days


7