A and B can finish a piece of work in 16 days and 12 days respectively. A started the work and worked at it for 2 days. He was then joined by B. Find the total time taken to finish the work.
Number of days A required do a piece of work : 16
Number of days B required do a piece of work : 12
Work done by A in one day: ![]()
Work done by B in one day: ![]()
A works alone for 2 days, so work completed by A in 2 days :
= ![]()
Work left = ![]()
Work done by A and B together in one day:
= ![]()
They can do the work together in
days .
But
th of the work is done by both A and B
Time required to complete
th of the work together by A and B :
6 days
Time taken to finish the work 6 + 2 = 8days ( here 2 is added because
work is done by A alone).
Total time taken to finish the work: 8days