A can do of a certain work in 16 days and B can do of the same work in 3 days. In how many days can both finish the work, working together?

A can do of a work in 16 days


B can do of a work in 3 days


Work done by A in one day:


Work done by B in one day:


Work done by A and B together in one day: =


They can do the work together in 8 days.


10